Quality control, step by step
Five gates between incoming fiber and the export carton. Each one has a written limit, a record and a person responsible — and the records travel with the goods.
Five gates, no sampling shortcuts
Assemblies are measured individually. Sampling applies to packaging and appearance, never to optical performance.
Fiber, ferrules and housings checked against the lot certificate; reel labels recorded against the order.
Strip, clean, epoxy and cure under controlled temperature; crimp force checked on the first piece each shift.
Four-step film sequence per connector type. Every end face is inspected; ferrule geometry is measured every 200 pieces.
Insertion loss and return loss in both directions; end face inspected to IEC 61300-3-35.
AQL 0.65 on labeling, length, packing and carton drop; test data filed by serial number.
What we accept, what we reject
| Parameter | Limit |
|---|---|
| Insertion loss, single-mode patch cord | ≤ 0.20 dB (standard) / ≤ 0.15 dB (premium) |
| Return loss, UPC / APC | ≥ 50 dB / ≥ 60 dB |
| Insertion loss, MPO-12 trunk | ≤ 0.35 dB standard, ≤ 0.25 dB low-loss |
| End-face | No scratch or pit in zone A/B, IEC 61300-3-35 |
| Length tolerance | ±20 mm below 2 m, ±1% above |
| Final inspection | AQL 0.65, ISO 2859-1 general level II |
Test data is exported as PDF by default and as CSV on request. Serial numbers on the cable label match the file, so an incoming inspection can be reconciled line by line.
What we test with
The laboratory is inside the plant, not outsourced — results come back in minutes, not weeks.
Two interferometers
Geometry and scratch measurement, used on the sample plan and on any end face that fails the visual check.
Light source and power meter
IL measured at 850/1300 nm or 1310/1550 nm, both directions.
Climate chamber
Damp heat and thermal cycling to IEC 61753-1 on the sample plan.
OTDR
Span and breakout verification for MPO trunks and pre-terminated drop cable.
Crimp pull tester
Boot retention checked at 100 N on the first piece of every batch.
Carton drop tester
1.2 m drop test on the packed carton before the first shipment of a new artwork.
Containment, root cause, correction
- Contain within 4 hours — the affected serial range is quarantined in the warehouse and in transit.
- Trace to the lot — fiber reel, ferrule batch, polishing film and operator shift.
- Report in 24 hours — 8D format with photos, root cause and corrective action.
- Replace or credit — free replacement on confirmed defects within the 3-year warranty.
Want our QC plan for your audit?
We can send the inspection plan, the AQL table and a redacted test report before you place an order.